Key principles.
Butt, lap, T
Butt: tensile. Lap: shear. T: structural.
Per thickness
Square < 3 mm. V-groove 3-20 mm. Double-V > 15 mm.
Tool path
Welder must reach joint. 50 mm clearance min.
Heat-induced
Heat causes shrinkage, distortion. Plan in DFM.
Match preferred
Same thickness ideal. Mismatch causes thermal mismatch.
Plan stack-up
Welded assemblies typically need post-weld machining.
FAQ
TIG: precision, slow. MIG: production, faster. Spot: high-volume sheet metal.
Match base metal. ER70S-6 mild steel. ER308L for 304 stainless. ER316L for 316L. ER4043 aluminum.
Symmetric weld sequences, fixturing, post-weld machining. Critical for thin material.
5-15 mm HAZ. Material properties altered. Plan precision features away from HAZ.
Visual standard. PT/MT for surface cracks. RT/UT for internal flaws. Per code.
AWS D1.1 structural steel. AWS D1.2 aluminum. ASME IX pressure vessels.
Get an instant quote
Send your CAD — we reply with detailed pricing, lead time, and DFM feedback within 4 working hours.
Talk to an engineer
WhatsApp our team directly. Most messages answered within 12 minutes during work hours.
Explore all services
CNC, 3D printing, injection molding, sheet metal, casting, finishing — one quality system, one partner.
Working on a live project? Send the STEP file and the two or three features you are unsure about — an engineer replies with DFM notes and a price, usually within four working hours.