ISO 9001:2015ITAR RegisteredRoHS · REACHLead time from 3 business daysMOQ = 1 part
PifyC
Services
Materials
Industries
Applications
Resources
Locations
Company
Request a quote
5-axis CNC milling drawing: Al 7075-T6 block with pockets, toolpath and dimensions
CNC Machining for Canada

Canadian engineering. Wuxi production. 4-day DHL coast-to-coast.

CNC machining services for Canadian companies coast-to-coast. CAD invoicing, DHL Priority 4 days to Toronto/Vancouver/Montreal, experienced with Canadian aerospace, mining, and oil and gas OEM customers.

North AmericaWuxi, ChinaMOQ 1 partDFM review included
Technical plate for Canadian engineering. Wuxi production. 4-day DHL coast-to-co
How we run it

CNC machining Canada

Send your CAD — we reply with detailed pricing, lead time, and DFM feedback within 4 working hours.

3-7 daysTypical lead time
MOQ 1No minimum quantity
<4 hQuote response
ISO 9001Quality system
01 · Why Canada companies choose us

The Canada customer advantage.

CAD invoicing

Pay in Canadian dollars at fixed exchange rate. No cross-border FX volatility on your end.

DHL Priority 4 days

Wuxi to Toronto, Vancouver, Montreal, Calgary, Ottawa in 4 business days door-to-door.

CUSMA documentation

Commercial invoices formatted for Canadian customs entry. GST/HST handling documented.

Canadian aerospace experience

Serving Toronto-area aerospace Tier-2 suppliers in Bombardier and Pratt & Whitney Canada supply chains.

Mining & heavy industry

Mining equipment components for Sudbury, Kirkland Lake operations — wear-resistant hardware.

Oil & gas components

NACE-qualified sour-service hardware for Alberta oil sands operations.

Bilingual capability

English primary; French-language RFQs accepted for Quebec customers. Dedicated bilingual coordinator.

Maritime provinces support

Full service to Halifax, St. John's, Charlottetown despite longer transit (typically 4–5 days).

Mutual NDAs

NDAs under Canadian law accepted and standard before technical review.

02 · Shipping & logistics

Logistics to Canada.

DHL Priority

4 business days to any major Canadian city. Primary service for most Canadian shipments.

FedEx Priority

4 business days alternative. Slightly different customs entry process than DHL.

Canada customs

Handled by broker partner registered with Canada Border Services Agency (CBSA).

Import duty

Most machined parts 0–6.5% duty under Canadian tariff schedule. Check specific HS code.

GST / HST

5% GST or 13-15% HST depending on destination province. Reclaimable by registered businesses.

Sea freight

For large orders, sea freight to Vancouver/Montreal port + truck inland. 25–30 days transit.

03 · Industries served

Where our Canada parts ship.

Aerospace OEMs

Toronto and Montreal Tier-2 suppliers to Bombardier, Pratt & Whitney, CAE, De Havilland

Mining equipment

Sudbury, Kirkland Lake, Timmins mining operations — wear parts, drilling hardware, slurry handling

Oil and gas

Alberta oil sands Tier-2 suppliers — downhole tools, flow control hardware in NACE materials

Defense contractors

Canadian defense suppliers in Ontario and Quebec — controlled goods program customers

Medical device OEMs

Toronto, Vancouver, Montreal medical device manufacturers

Hardware startups

Toronto, Vancouver, Waterloo hardware startup ecosystem — venture-funded seed to Series B

Clean tech

Vancouver cleantech startups, hydrogen fuel cell developers, BC hydro supply chain

Forestry equipment

BC and Eastern Canada forestry machinery — saws, chippers, skidder components

University research

University of Toronto, UBC, McGill, Waterloo research group specialty instrument components

Get an instant quote

Send your CAD — we reply with detailed pricing, lead time, and DFM feedback within 4 working hours.

Talk to an engineer

WhatsApp our team directly. Most messages answered within 12 minutes during work hours.

Explore all services

CNC, 3D printing, injection molding, sheet metal, casting, finishing — one quality system, one partner.

FAQ

Canadian engineering — questions

How does shipping to western vs eastern Canada compare?

DHL Priority: 4 days to any major Canadian city regardless of east/west. Wuxi → LAX or Anchorage → Canadian city. Vancouver and Toronto actually see similar transit times because the Pacific crossing dominates. For remote locations (Yukon, Nunavut, remote BC/NWT), add 1–2 days for last-mile delivery.

Do you handle CUSMA (USMCA) documentation?

CUSMA primarily affects US-Canada-Mexico trade; goods manufactured in China don't qualify for CUSMA preferential treatment. Shipments from China to Canada use standard Most Favored Nation (MFN) duty rates. Our commercial invoices include correct country of origin (China), HS codes, and CUSMA-compatible formatting. Your broker handles customs entry.

Can you support Quebec customers in French?

Yes — we have a bilingual customer coordinator who handles Quebec RFQs and correspondence in French. Technical drawings and specifications accepted in French. Quote responses can be provided in French on request. For complex technical discussions, we may use English as a common language with translation support.

How do import duties work on CNC machined parts?

Most machined parts fall under HS 8487 (general machinery parts) or 8466 (specific machine parts) — duty rates 0–6.5% depending on exact HS classification. 5% GST applies federally; HST (13–15%) in HST provinces (Ontario, Maritimes) or GST + PST in others. GST/HST reclaimable by registered businesses through standard CRA process.

Do you have experience with Alberta oil and gas customers?

Yes — Alberta oil sands Tier-2 suppliers are a regular customer base. We understand NACE MR0175 sour-service requirements, API-adjacent documentation needs, and the material specifications common in Alberta operations (Inconel 718, 17-4 PH H1150, duplex 2205). API monogram requirements routed through qualified subcontracting partners.

What is the typical lead time door-to-door?

Typical total lead time from PO to Canadian doorstep: 8–14 days. Breakdown: 5–10 days manufacturing, 1–2 days preparation and shipping, 4 days DHL Priority transit. Customs clearance usually same-day for straightforward shipments. For expedited orders, rush service (additional 50% cost) cuts manufacturing to 2–3 days — total door-to-door 6–8 days.

5-axis CNC milling drawing: Al 7075-T6 block with pockets, toolpath and dimensions

Send a CAD file. Get an engineering-reviewed quote.

No minimum quantity, free DFM feedback from a senior manufacturing engineer, and an NDA signed before file review on request.