ISO 9001:2015ITAR RegisteredRoHS · REACHLead time from 3 business daysMOQ = 1 part
PifyC
Services
Materials
Industries
Applications
Resources
Locations
Company
Request a quote
Injection mould drawing: two tool halves, cavity, gate and ejector pins
Compare · Machining vs Molding

Machining vs molding. Volume decides. Process choice.

Plastic machining vs injection molding decision. Machining no tooling, volume-flexible. Molding requires tooling, mass-produces. Volume crossover ~1000-5000 parts.

Process comparisonsWuxi, ChinaMOQ 1 partDFM review included

Key principles.

Major

CNC: no tooling. Mold: $20-100K tool. Crossover above 1-5K parts.

High vs low

CNC $20-200/part. Molded $0.50-10/part. 5-20× difference.

Fast vs slow

CNC 5-10 days. Mold 8-12 weeks build + parts.

CNC tighter

CNC ±0.025 mm. Mold ±0.1-0.3 mm typical.

CNC any / Mold molded

CNC any geometry. Mold draft + uniform walls + no undercuts.

Bar vs molded grade

CNC bar stock. Mold plastic injection grade. Slightly different properties.

FAQ

1-5K parts depending on complexity. Below: CNC. Above: mold investment pays back.

Aluminum mold tooling for low-volume bridge production. Urethane casting for short-run.

CNC bar/sheet stock. Injection-grade material has different rheology. Specs may differ.

CNC ±0.025 mm achievable. Injection ±0.1 mm typical. Tight features post-machined.

Molding: 1-2° draft, uniform walls, no undercuts (or slides). CNC: any geometry within tool reach.

CNC prototype + injection production. Standard product development path.

Get an instant quote

Send your CAD — we reply with detailed pricing, lead time, and DFM feedback within 4 working hours.

Talk to an engineer

WhatsApp our team directly. Most messages answered within 12 minutes during work hours.

Explore all services

CNC, 3D printing, injection molding, sheet metal, casting, finishing — one quality system, one partner.

Working on a live project? Send the STEP file and the two or three features you are unsure about — an engineer replies with DFM notes and a price, usually within four working hours.

5-axis CNC milling drawing: Al 7075-T6 block with pockets, toolpath and dimensions

Send a CAD file. Get an engineering-reviewed quote.

No minimum quantity, free DFM feedback from a senior manufacturing engineer, and an NDA signed before file review on request.